Project

General

Profile

DC #61

DC ROOM UPDATES

Added by Jal Arancon about 2 months ago. Updated about 2 months ago.

Status:
New
Priority:
Medium
Assignee:
-
Start date:
10/17/2025
Due date:
% Done:

0%

Estimated time:

Description

10/17/25 - DC 103 PTAC was - replaced micro board on unit

History

#1

Updated by Jal Arancon about 2 months ago

  • Tracker changed from PSS to DC
#2

Updated by Jal Arancon about 2 months ago

Jal Arancon wrote:

10/17/25 - DC 103 PTAC was - replaced micro board on unit

10/17/25 - fixed the door handle 119, 114 door handle needs to be fix too

#3

Updated by Jal Arancon about 2 months ago

10/17/25 - room 114 tightened the door handle

#4

Updated by Jal Arancon about 2 months ago

Ben installed a new breaker in DC cause of continuous power issues of 122 and 120 / 10/18/25

Also available in: Atom PDF