+By Priority+
# Dryer capacitor hookup once arrive Wall Knock Down, side stucco work - on hold
# Dump Truck sides - sturdy sides, prefer they be removable. Lifting beams, straighten
# Foundation Fill -where are we at...
# Lighting - Building Two .. steve to check for power on old existing light before putting in 2nd stadium light. Building Three- stadium light wired with the exterior lights so come on same time
# BI Main Entry Door - 4'x80.5" On Timer, new light, pointed towards building 1
# Galley Bar area - completely cleaned out? The 2 Bar Bathrooms new shower, gally, ready for guest?
# BI - confirm Double Check all good and add shower. plumbing, drains,
# Electrical Update on BI - lighting, etc.
# Dump Truck sides
On Hold Type Projects
# Wall Knock Down, side stucco work - on hold due to neighbor
# Lifting beams, straighten the balcony - city will not approve permit
# Foundation Fill -hole filled, but still not level
# Dryer capacitor hookup once arrive Wall Knock Down, side stucco work - on hold
# Dump Truck sides - sturdy sides, prefer they be removable. Lifting beams, straighten
# Foundation Fill -where are we at...
# Lighting - Building Two .. steve to check for power on old existing light before putting in 2nd stadium light. Building Three- stadium light wired with the exterior lights so come on same time
# BI Main Entry Door - 4'x80.5" On Timer, new light, pointed towards building 1
# Galley Bar area - completely cleaned out? The 2 Bar Bathrooms new shower, gally, ready for guest?
# BI - confirm Double Check all good and add shower. plumbing, drains,
# Electrical Update on BI - lighting, etc.
# Dump Truck sides
On Hold Type Projects
# Wall Knock Down, side stucco work - on hold due to neighbor
# Lifting beams, straighten the balcony - city will not approve permit
# Foundation Fill -hole filled, but still not level