** Steve Punch List

Added by Sieu Ngo 6 months ago. Updated 4 days ago.

Status:
New
Priority:
Medium
Assignee:
-
Category:
-
Start date:
02/09/2026
Due date:
% Done:

0%

Estimated time:

Description

By Priority
  1. BI - complete East Side of building, and Front (including roof tiles/windows) + add in the 4 windows
  2. Galley area - completely cleaned out? The 2 Bar Bathrooms - all functional? Shower Area?
  3. door latches and rubber threshold.
  4. roof leaks - and draining... esp by breezeway
On Hold Type Projects
  1. Wall Knock Down, side stucco work - on hold due to neighbor
  2. Lifting beams, straighten the balcony - city will not approve permit
  3. Foundation Fill -hole filled, but still not level
  4. Dump Truck sides - sturdy sides, prefer they be removable.
Phx Related Items
  1. Hm - Roof Issues: Storage Shed and Water Damage under Tile
  2. Hm - Kitchen Drywall, Ry AC Install.
  3. 44th St - New window, Leak by Citrus Tree, Facia Board - Bay Window.
  4. 69th - Ceiling Paint
  5. Paseo - Closet Lights

History

#1

Updated by Sieu Ngo about 2 months ago

  • Description updated (diff)
#2

Updated by Sieu Ngo about 2 months ago

  • Tracker changed from PSS to WI
  • Description updated (diff)
#3

Updated by Sieu Ngo 17 days ago

  • Description updated (diff)
#4

Updated by Sieu Ngo 16 days ago

  • Description updated (diff)
#5

Updated by Sieu Ngo 16 days ago

  • Description updated (diff)
#6

Updated by Sieu Ngo 15 days ago

  • Description updated (diff)
#7

Updated by Sieu Ngo 4 days ago

  • Description updated (diff)

Also available in: Atom PDF