Project

General

Profile

WI #88

** Steve Punch List

Added by Stu N 8 months ago. Updated about 1 month ago.

Status:
New
Priority:
Medium
Assignee:
-
Category:
-
Start date:
02/09/2026
Due date:
% Done:

0%

Estimated time:

Description

By Priority
  1. BI - complete East Side of building, and Front (including roof tiles/windows) + add in the 4 windows
  2. Galley area - completely cleaned out? The 2 Bar Bathrooms - all functional? Shower Area?
  3. door latches and rubber threshold.
  4. roof leaks - and draining... esp by breezeway
On Hold Type Projects
  1. Wall Knock Down, side stucco work - on hold due to neighbor
  2. Lifting beams, straighten the balcony - city will not approve permit
  3. Foundation Fill -hole filled, but still not level
  4. Dump Truck sides - sturdy sides, prefer they be removable.
Phx Related Items
  1. Hm - Roof Issues: Damage under Tile
  2. Hm - Kitchen Drywall,
  3. 44th St - New window, Leak by Citrus Tree, Facia Board - Bay Window.
  4. 69th - AC Line Clog and BackYard!!
  5. Paseo - Closet Lights, Repaint?, Turf
  6. Bev2- Dead Plants
FD Stuff
  • Basement
  • Bar Bathroom conversion
  • Bar Living Area
  • Weed Eater
  • Use Next Door
  • Seniors, marketing
  • kitchen for rm 212
  • Internet Fiber Setup
  • Tinted Windows

History

#1

Updated by Stu N 3 months ago

  • Description updated (diff)
#2

Updated by Stu N 3 months ago

  • Tracker changed from PSS to WI
  • Description updated (diff)
#3

Updated by Stu N 3 months ago

  • Description updated (diff)
#4

Updated by Stu N 2 months ago

  • Description updated (diff)
#5

Updated by Stu N 2 months ago

  • Description updated (diff)
#6

Updated by Stu N 2 months ago

  • Description updated (diff)
#7

Updated by Stu N 2 months ago

  • Description updated (diff)
#8

Updated by Stu N about 2 months ago

  • Description updated (diff)
#9

Updated by Stu N about 1 month ago

  • Description updated (diff)
#10

Updated by Stu N about 1 month ago

  • Description updated (diff)

Also available in: Atom PDF