WI #88
Updated by Sieu Ngo 17 days ago
+By Priority+
# BI Dryer capacitor hookup once arrive
# Dump Truck sides - sturdy sides, prefer they be removable.
# Lighting - Building Two .. steve to check for power on old existing light before putting in 2nd stadium light. Building Three- stadium light wired with the exterior lights so come on same time
# BI Main Entry Door - 4'x80.5"
# Galley area - completely cleaned out? The 2 Bar Bathrooms - confirm all good and add shower.
# Electrical Update on BI - lighting, etc.
On Hold Type Projects
# Wall Knock Down, side stucco work - on hold due to neighbor
# Lifting beams, straighten the balcony - city will not approve permit
# Foundation Fill -hole filled, but still not level
# Dump Truck sides - sturdy sides, prefer they be removable.
Phx Related Items
# Hm - Roof Issues: Storage Shed and Water Damage under Tile
# Hm - Kitchen Drywall, Ry AC Install.
# 44th St - New window, Leak by Citrus Tree, Facia Board - Bay Window.
# 69th - Ceiling Paint
# Paseo - Closet Lights
# BI Dryer capacitor hookup once arrive
# Dump Truck sides - sturdy sides, prefer they be removable.
# Lighting - Building Two .. steve to check for power on old existing light before putting in 2nd stadium light. Building Three- stadium light wired with the exterior lights so come on same time
# BI Main Entry Door - 4'x80.5"
# Galley area - completely cleaned out? The 2 Bar Bathrooms - confirm all good and add shower.
# Electrical Update on BI - lighting, etc.
On Hold Type Projects
# Wall Knock Down, side stucco work - on hold due to neighbor
# Lifting beams, straighten the balcony - city will not approve permit
# Foundation Fill -hole filled, but still not level
# Dump Truck sides - sturdy sides, prefer they be removable.
Phx Related Items
# Hm - Roof Issues: Storage Shed and Water Damage under Tile
# Hm - Kitchen Drywall, Ry AC Install.
# 44th St - New window, Leak by Citrus Tree, Facia Board - Bay Window.
# 69th - Ceiling Paint
# Paseo - Closet Lights